[1]
2022. Analysis of Disturbed Lands of the South Quarry of the Konstantynovskyi District for their Further Reclamation and Target Development. Visnyk of Vinnytsia Politechnical Institute. 1 (Mar. 2022), 11–15. DOI:https://doi.org/10.31649/1997-9266-2022-160-1-11-15.